42-371-39320

Final Completion

HARRAL STATE 82

PECOS County · District 8 · STANOLIND PRODUCTION LLC · WILDCAT

RRC Lookup

Permits

2

Max Depth

10,350 ft

First Permit

2015-04-02

Latest Activity

2015-04-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2015-06-12

Shut-In

Plugged

2020-08-06

!

EWA / Permit operator mismatch

Scheduling: STANOLIND PRODUCTION LLC ≠ Permit: STANOLIND OPERATING LLC

Resolved via: schedulingSTANOLIND PRODUCTION LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2015-06

Last Production

2020-10

Operator History

originally filed by STANOLIND OPERATING LLC — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#805233 A STANOLIND OPERATING LLC
received 2015-04-22
#805233 A STANOLIND OPERATING LLC
received 2015-04-02

Well Details

Well Number
1
Max Depth
10,350 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
2015-06-12

Operator

Location
MIDLAND
P-5 Status
Y (filed 2021-04-09)
Cum Oil (all leases)
713,274 bbl
Cum Gas (all leases)
6,926,763 mcf
Total Permits
8

External Links

Live © 2026 Petrora